Credit Meadows Park Expansion

Share on Facebook Share on Twitter Share on Linkedin Email this link

The City of Mississauga is developing pedestrian bridges and trails in the northern portion of Credit Meadows (the former Harris Lands).

Class Environmental Assessment Study

This project is being planned as a Municipal Class Environmental Assessment, Schedule B Process.

Project File Report

Thank you for your comments on the Project File Report (PFR), the final 30-day review period is now complete. The preferred options for Credit Meadows includes construction of two pedestrian bridges over the Credit River, construction of primary connecting trails connecting the entrance laneway on former Harris Lands with the existing Credit Meadows park and the residential community along Swinbourne Drive.

The City of Mississauga is developing pedestrian bridges and trails in the northern portion of Credit Meadows (the former Harris Lands).

Class Environmental Assessment Study

This project is being planned as a Municipal Class Environmental Assessment, Schedule B Process.

Project File Report

Thank you for your comments on the Project File Report (PFR), the final 30-day review period is now complete. The preferred options for Credit Meadows includes construction of two pedestrian bridges over the Credit River, construction of primary connecting trails connecting the entrance laneway on former Harris Lands with the existing Credit Meadows park and the residential community along Swinbourne Drive.