The Credit Woodlands integrated road project
A safer roadway for everyone
The City of Mississauga is rehabilitating and redesigning the roadway around Bert Fleming Park to make it safer and easier to access for everyone.
This project will be bundled with other road improvement and renewal projects, such as necessary road resurfacing work, to improve efficiency and costs to the community. This means that construction only needs to happen once.
Improvements and renewals include:
- Rehabilitated roads
- Improved intersections
- Increased road safety
- New transit infrastructure
- Renewed landscaping
Selected design alternative
A design alternative is an option for completing an infrastructure project. For the roadway around Bert Fleming Park, a total of ten design alternatives were considered before the City selected the design alternative featuring a modification of the original configuration with two-way traffic and two mini-roundabouts.
More information about the project, the reason for the redesign, design alternatives and project updates are available at www.mississauga.ca/thecreditwoodlands.
Have questions or comments about the project or the selected design alternative? Submit your questions or comments here, and a project team member will answer as soon as possible.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends